Call: 513-271-4226 Subscribe to Mini-Equipment.comNews FeedSubscribe to Mini-Equipment.comComments

Partial Demolition of Concrete Pool Deck

January 12, 2009 by  
Filed under CB Tracked Hauler Videos

Project: Partial replacement of a concrete pool deck. The deck had settled badly, needed to be partially removed and fill brought in. The surrounding area was well landscaped and the remaining portion of the concrete deck needed to remain undamaged. Access was limited through a pool gate.

Solution: CB Tracked Hauler with auxiliary power take off (optional) and a hydraulic breaker were employed for the demolition and removal of the concrete. Gravel fill was also brought in by CB Tracked Haulers.

Leave us a quick comment on how the optional auxiliary power take off may benefit you in your contracting business!

Share

Can Your Concrete Buggy Do This – Dump Over The Side Of A 20yd Dumpster

November 6, 2008 by  
Filed under CB Tracked Hauler Videos

             CB Tracked Hauler stars in:  The High Dump!

A traditional concrete buggy or power buggy does not give you the ability to lift your load and dispose of it over the side of a 20 yard dumpster.  This is one of the most unique features of the CB Tracked Hauler.  But more importantly it is one of the most valuable benefits this machine offers.  That benefit is efficiency.  No more partially loaded dumpsters (Money).  No more dumping the load next to the box and then loading it by hand (Time, which is Money).

Share