Partial Demolition of Concrete Pool Deck
January 12, 2009 by Kerry
Filed under CB Tracked Hauler Videos
Project: Partial replacement of a concrete pool deck. The deck had settled badly, needed to be partially removed and fill brought in. The surrounding area was well landscaped and the remaining portion of the concrete deck needed to remain undamaged. Access was limited through a pool gate.
Solution: CB Tracked Hauler with auxiliary power take off (optional) and a hydraulic breaker were employed for the demolition and removal of the concrete. Gravel fill was also brought in by CB Tracked Haulers.
Leave us a quick comment on how the optional auxiliary power take off may benefit you in your contracting business!


Comments
Feel free to leave a comment...
and oh, if you want a pic to show with your comment, go get a gravatar!